So what is everyone working on this Winter 2017?
Please include your goals/list of projects you plan to complete.

Here is my list:
- Engine transmission and transfer case rebuild
- Install OIL Cooler with EVO 3 OFH (done)
- EVO 3 intake manifold (done)
- New fuel filter
- Shrouding for FMIC
- Reseal oilpan to stop small oil leak. (done)
- Install oil pressure gauge
- New clutch: SouthBend Endurance Stage 3 Kevlar disk or ACT 2600.
- Aluminum and adjustable upper control arms (front)
- Replace front subframe (done)
- Replace power steering rack and replace PS lines. (done)
- Install hella horns
- Install front OEM fogs, make them fit with FMIC
- Figure out why front rotors squeaking (changing pads didnt solve the issue)

Side projects:
- rebuild rotary engine for rx8.


1996 Eagle Talon TSi AWD
1999 Eclipse GST Automagic
1991 3000GT VR-4